气井带压作业装置
Your current location : Home >> News >> Common Problem

ContactContact

Yancheng Dagang Petroleum Tools Factory Co., Ltd.

Chairman:Li Zhongbiao

Cell Phonee:13905103695   

Sales Manager:Li Hao

Cell Phonee:18261221619

Supervisor:Wu Hanhua      

Cell Phonee:13770022508

Sales Manager:Wu Bin       

Cell Phonee:18001581009

Phone: 0515-88807370 

Fax: 0515-88807228

E-mail:zb@zhongbiaocn.com

Address:No.888 Weiyi Road, Dagang Town, Yandu District, Yancheng City

Talking about several methods of plugging the tubing of oil-water wells under pressure

2020-12-03 09:49:09
a

Talking about several methods of plugging the tubing of oil-water wells under pressure

Working under pressure mainly refers to the operation in the wellbore with professional equipment and tools under pressure at the wellhead of oil, gas and water wells. Its main function is not to pollute the formation and not to change the current formation pressure. In actual work, affected by the scaling (wax) of the original well tubing string, the inner diameter of the tubing became smaller, resulting in the plugging of the plugging device in most cases, or even the plugging tool cannot be used at all. In some wells, after plugging plugs were in place, the packers on the original well string could not be unblocked, the plugs could not be salvaged or the success rate of salvage was low, which made the subsequent workover more difficult. How to apply the current process technology to meet the needs of workover, talk about a few methods


The label

0
Fast Navigation

Navigation

Service Hotline:0515-88807370    0515-88807228

Email :zb@zhongbiaocn.com

Company Address:No.888 Weiyi Road, Dagang Town, Yandu District, Yancheng City                      Su ICP No. 2021000848

Disclaimer: Some of the content pictures on this site are from the Internet. If there is any infringement, please contact the administrator to delete it, thank you!