气井带压作业装置
Your current location : Home >> News >> Common Problem

ContactContact

Yancheng Dagang Petroleum Tools Factory Co., Ltd.

Chairman:Li Zhongbiao

Cell Phonee:13905103695   

Sales Manager:Li Hao

Cell Phonee:18261221619

Supervisor:Wu Hanhua      

Cell Phonee:13770022508

Sales Manager:Wu Bin       

Cell Phonee:18001581009

Phone: 0515-88807370 

Fax: 0515-88807228

E-mail:zb@zhongbiaocn.com

Address:No.888 Weiyi Road, Dagang Town, Yandu District, Yancheng City

Domestic demand analysis for gas wells under pressure operation equipment

2020-12-03 04:17:05
a

Domestic demand analysis for gas wells under pressure operation equipment

At present, most of the onshore oil fields in my country have entered the middle and late stages of development. The pressure of oil and gas wells has been decreasing year by year, and the contradiction between injection and production has become increasingly prominent. In order to greatly increase the recovery rate, various new processes and new technologies have been widely used in different oil fields. Applications.

With the continuous improvement of oilfield experts' understanding of pressure operation technology, all domestic oilfields are considering the protection of oil and gas layers during drilling and workover processes, construction safety and environmental protection, whether it is onshore oilfields or beach seas. The shallow sea oil fields have great demand for pressure operations.

These requirements are mainly reflected in the following aspects:

Gas well operation's demand for well pressure

Many gas wells have the characteristics of low pressure coefficient and good physical properties. During drilling and workover, they are prone to lost circulation, causing killing fluid to enter the formation, causing mineral migration and expansion, and causing formation blockage. Pressure operation technology can solve the problem of gas layer protection and avoid the impact of well fluid leakage.

Domestic demand analysis for equipment under pressure

Low permeability oil field demand

A large proportion of my country’s oilfield resources are low-permeability oilfields. For a long time, they have been affected by the characteristics of low-permeability oilfields and restricted by technical conditions, resulting in a large gap in the average recovery rate of low-permeability oilfields. The characteristics of low porosity, poor connectivity, high cement content, complex structure, high primary water saturation, and serious heterogeneity make it vulnerable to damage during mining and drilling. It is urgently needed to improve the operation through the technology of pressure operation equipment The status quo, improve the recovery rate.

Special structure well needs

Due to the complexity of the geological structure in some places, higher-density kill fluids are required for conventional exploration, which increases the difficulty of later logging and can easily cause misinterpretation or even miss oil and gas layers. If the working technology under pressure can be used, the logging error rate can be reduced, the oil and gas reservoirs can be protected, and the subsequent completion and use process can be guaranteed.

Construction requirements for water injection wells

Many water injection wells are affected by the increase in wellhead injection pressure after water injection, which will cause the problem of low permeability. In conventional operations, it takes a long time to depressurize and construct, which will affect the entire surrounding area and cause environmental problems. The use of pressure working technology can reduce environmental problems and shorten the pressure protection time, thereby enhancing the recovery rate.


The label

0
Fast Navigation

Navigation

Service Hotline:0515-88807370    0515-88807228

Email :zb@zhongbiaocn.com

Company Address:No.888 Weiyi Road, Dagang Town, Yandu District, Yancheng City                      Su ICP No. 2021000848

Disclaimer: Some of the content pictures on this site are from the Internet. If there is any infringement, please contact the administrator to delete it, thank you!